Lightning protection for all kinds of houses, businesses, public buildings and solar PV. One lightning strike can cost more than the lightning rod. Give us the address, we do the rest.
Blue, yellow and red on the mapThis is the rain radar: where it is raining right now and how heavily, over roughly the last 2 hours. Red patches are the heaviest rain, usually from thunderclouds.
The coloured city dotsThe thunderstorm forecast for the selected day. Pulsing cities expect thunderstorms. Tap a city to see details.
Why it mattersIn a thunderstorm, lightning seeks the highest point: a roof, a chimney, a mast, a tree. Protection must be in place before the season, not after the strike.
When storms hit Bulgaria
Thunderstorms come most often in the warm months, usually in the afternoon and evening after a hot day.
April – MayStart of the seasonThe first thunderstorms. They often arrive quickly after a warm, humid day.
June – AugustThe peak seasonThe most thunderstorms, hail and downpours. This is when strikes on buildings are most frequent.
SeptemberStorms ease offThere are still strong days, especially in mountain areas.
October – MarchThe quiet seasonThunderstorms are rare. The best time for a site visit and installation, before the season starts.
Mountains and foothillsRila, Pirin, the Rhodopes and the Balkan Mountains. Storms form more often and faster over them. The Struma valley (Sandanski, Petrich) is one of the hottest places in the country, and in summer it often gets thunderstorms coming off Pirin and Belasitsa.
Open and high groundDetached houses, hillsides, villas outside the village, industrial halls and farms in open fields.
Solar PV and metalPanels, metal roofs and masts do not attract lightning on their own, but a strike on them reaches the inverter and the installation.
Lightning protection FAQ
How much does a lightning rod for a house cost?
The House package is from €1,499 installed and from €690 supply only, incl. VAT. It includes an ONAY air terminal from OLP 50 to OLP 214 depending on the coverage needed, a 2 m mast, one down conductor and earthing. The exact price depends on the roof, the height and the soil.
Active or passive lightning protection?
An active air terminal covers a large area with a single head on the roof. Passive protection uses many rods and conductors across the roof. For most houses, businesses and solar PV systems, active protection is simpler to install.
What is a lightning rod and how does it work?
A lightning rod, or lightning protection system, takes the lightning strike and carries it safely into the ground. The air terminal on the roof captures the strike, the down conductor carries it down the facade, and the earthing disperses the energy into the soil.
What is an early streamer emission air terminal?
This is an active air terminal, such as ONAY OLP. It sends an upward discharge 23 to 63 microseconds earlier than other points nearby, so the lightning heads for it, and a single head protects a large area.
Do solar PV systems need lightning protection?
The panels on the roof increase the risk of a strike and of surges along the cables to the inverter. The solar PV package includes an air terminal on a mast set apart from the panels, earthing with measurement, equipotential bonding and surge protection: from €990 supply only and from €1,399 installed, incl. VAT.
What radius does the air terminal cover?
From 24–65 m for OLP 50 to 45–111 m for OLP 214, depending on the mast height and the protection level.
Is lightning protection required for Act 16?
For new buildings, lightning protection is designed under Ordinance No. 4 on Lightning Protection of Buildings, Outdoor Facilities and Open Spaces. Where the design includes it, the building cannot receive Act 16 until the lightning protection is installed and measured. We provide the measurement report for the documents.
How many down conductors are fitted?
Under Art. 166 of Ordinance No. 4, at least two down conductors are designed when the horizontal projection of the down conductor is greater than the vertical one. For most houses, one down conductor is enough.
How often should lightning protection be inspected?
Depending on the protection level, at least once every 1, 2 or 3 years. At each inspection the earthing is measured and a report is issued.
Do you install outside the big cities?
Yes, we install across Bulgaria. For remote sites, transport is shown in the quote.
About usWho we are and what we do
We are not a new company. We are part of the Mitov Electric group: 12 years in electrical engineering and more than 250 completed projects. We hold every certificate needed for sales, installation and measurement. We sell and install certified products only. Every system ends with a measurement and documents that are accepted by insurers, inspection authorities and buyers when the property is sold.
Our group
One group: from the wiring in the house to the lightning above it
LIGHTNING PROTECTIONLIGHTNING RODS · INSTALLATIONyou are here
Ready-made packages for homes, businesses and solar PV: product, installation, measurement and documents across Bulgaria.
Certificates and measurementeverything by the book
CE · ISO 9001
Certified products
ONAY OLP air terminals carry CE marking, are made under ISO 9001 certified production and are tested in an independent laboratory.
Laboratory
Measurement by an accredited laboratory
Earthing and lightning protection are measured by an accredited testing laboratory, not judged by eye.
BDS EN 62305 (EN 62305)
Built to standard
Active lightning protection is built to NF C 17-102, and passive to BDS EN 62305 (EN 62305).
Documents
Full set of documents
You receive a measurement report, a declaration of performance and the air terminal’s product passport, which is also the manufacturer’s warranty card.
What the law says
Lightning protection and Act 16
For new buildings, lightning protection is designed and built under Ordinance No. 4 on Lightning Protection of Buildings, Outdoor Facilities and Open Spaces. Where the design includes it, without installed and measured lightning protection the building cannot receive Act 16 (the certificate of fitness for acceptance of the building). We build the system and provide the measurement report that goes with the documents.
How many down conductors are needed
Under Art. 166 of Ordinance No. 4 at least two down conductors are designed when the horizontal projection of the down conductor is greater than the vertical one. That is why one down conductor is enough for most houses, and for wider buildings we design two.
Become our partner
For electrical firms, installers and retailers
Do you work with electrical installations, roofs or solar PV? We help you offer lightning protection to your clients. You don’t need to be a company to contact us: leave your name and we will call you.
ONAY air terminals (active lightning rods) at special partner prices
Everything needed to build the lightning protection system: masts, conductors, earthing
Advice on choosing the head and on the quote for your client
If needed: measurement and documents from our team
On-site help from our specialists, even when you do the installation yourself
Ready for lightning protection?
Call us or request a quote. We reply within the working day.